MADIVIRA WATER PROJECT
DESCRIPTION:
The Madivira water project includes two springs, infiltration gallery 80m long, solar pumping station, 40 cubic metres storage steel tank and 1.7km rising main
IMPACT:
- Increase in access (1200 people connected).
-Solar motorised production
- 6km pipe network developed.
- Department: Water and Irrigation
- Year: 2024
- Location:
- Status: in_progress